Bukit Raja Selatan LRT station
Preceding station | Following station | |||
---|---|---|---|---|
Seksyen 7 Shah Alam towards Bandar Utama | Shah Alam Line Future service (opening 2025) | Bandar Baru Klang towards Johan Setia |
The Bukit Raja Selatan LRT station is a light rapid transit (LRT) station serving the Klang suburb in Selangor, Malaysia. It serves as one of the stations on the Shah Alam line. The station is an elevated rapid transit station in Taman Perindustrian Bukit Raja Selatan, Klang, Selangor, Malaysia, forming part of the Klang Valley Integrated Transit System.[1]
The station is marked as Station No. 16 along the RM9 billion line project with the line's maintenance depot located in Johan Setia, Klang.[2] The Bukit Raja Selatan LRT station was expected to be operational in February 2024, but Transport Minister Anthony Loke mentioned that the overall line would be expected to be operational by 1st March 2025 adding more delays to the opening of the Shah Alam Line.[3] It will have facilities such as public parking, kiosks, restrooms, elevators, taxi stand and feeder bus among others.[4]
The station was under provisional status due to budgetary cuts made during the change of the Malaysian government in 2018.[5] However, on 13 October 2023, during the Budget 2024 presentation, Finance Minister Dato' Seri Anwar Ibrahim announced the reintegration of the five stations that were previously under provisional status including the Bukit Raja Selatan LRT station to be built alongside the rest of the Shah Alam Line.[6]
Locality landmarks
- Bukit Raja Selatan Industrial Park
- Pusat Perniagaan Seksyen 7
- De Art Hotel Shah Alam
References
- ^ "Pelan Setiap Stesen". Prasarana Malaysia. Archived from the original on 2015-05-22. Retrieved 2015-05-17.
- ^ "Bukit Tinggi LRT Station". MRT Corp Malaysia.
- ^ "LRT3 TO START OPERATION IN MARCH 2025 - ANTHONY LOKE". BERNAMA. 2023-04-07. Retrieved 2023-07-05.
- ^ "Jangka Masa Projek LRT3". Prasarana Malaysia. Archived from the original on 2015-05-27. Retrieved 2015-05-17.
- ^ "Six LRT3 stations shelved: Are you affected?". malaysiakini. 13 July 2018. Archived from the original on 18 December 2019. Retrieved 18 December 2019.
- ^ Abdul Rahman, Sharil (13 October 2023). "Budget 2024: 5 previously provisional stations along the LRT Shah Alam Line will be built". SoyaCincau. Retrieved 13 October 2023.
External links
- LRT3 Bandar Utama–Klang line
- v
- t
- e
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- B1
- Batu Caves
- Taman Wahyu
- Kampung Batu
- Batu Kentonmen
- Sentul
- Putra
- Bank Negara
- Kuala Lumpur
- KL Sentral
- Mid Valley
- Seputeh
- Bandar Malaysia South (planned)
- Salak Selatan
- Bandar Tasik Selatan
- Maju KL (planned)
- Serdang
- Kajang
- Kajang 2
- UKM
- Bangi
- Batang Benar
- Nilai
- Labu
- Tiroi
- Seremban
- Senawang
- Sungai Gadut
- Rembau
- Pulau Sebang/Tampin
- Tanjung Malim
- Kuala Kubu Bharu
- Rasa
- Batang Kali
- Serendah
- Rawang
- Kuang
- Sungai Buloh
- Kepong Sentral
- Kepong
- Segambut 2 (future)
- Segambut
- Putra
- Bank Negara
- Kuala Lumpur
- KL Sentral
- Abdullah Hukum
- Angkasapuri
- Pantai Dalam
- Petaling
- Jalan Templer
- Kampung Dato Harun
- Seri Setia
- Setia Jaya
- Subang Jaya
- Batu Tiga
- Shah Alam
- Padang Jawa
- Bukit Badak
- Klang
- Teluk Pulai
- Teluk Gadong
- Kampung Raja Uda
- Jalan Kastam
- Port Klang
- Sentul Timur
- Sentul
- Titiwangsa
- PWTC
- Sultan Ismail
- Bandaraya
- Masjid Jamek
- Plaza Rakyat
- BBCC–Hang Tuah
- Pudu
- Chan Sow Lin
- Cheras
- Salak Selatan
- Bandar Tun Razak
- Bandar Tasik Selatan
- Sungai Besi
- Bukit Jalil
- Sri Petaling
- Awan Besar
- Muhibbah
- Alam Sutera
- Kinrara BK5
- Kinrara BK3 (planned)
- IOI Puchong Jaya
- Pusat Bandar Puchong
- Taman Perindustrian Puchong
- Bandar Puteri
- Puchong Perdana
- Puchong Prima
- Kampung Sri Aman (planned)
- Putra Heights
- Gombak
- Taman Melati
- Wangsa Maju
- Sri Rampai
- Setiawangsa
- Jelatek
- Dato' Keramat
- Damai
- Ampang Park
- KLCC
- Kampung Baru
- Dang Wangi
- Masjid Jamek
- Pasar Seni
- KL Sentral–redONE
- Bank Rakyat–Bangsar
- Abdullah Hukum
- Kerinchi
- Universiti
- Taman Jaya
- Asia Jaya
- Taman Paramount
- Taman Bahagia
- Kelana Jaya
- Lembah Subang
- Ara Damansara
- CGC–Glenmarie
- Subang Jaya
- SS15
- SS18
- USJ 7
- Taipan
- Wawasan
- USJ 21
- Alam Megah
- Subang Alam
- Putra Heights
- Kwasa Damansara
- Kwasa Sentral
- Kota Damansara–Thomson Hospital
- Surian
- Mutiara Damansara
- Bandar Utama
- Taman Tun Dr Ismail–Deloitte (TTDI)
- Phileo Damansara
- Bukit Kiara Selatan (planned)
- Pavilion Damansara Heights–Pusat Bandar Damansara
- Semantan
- Muzium Negara
- Pasar Seni
- Merdeka
- Pavilion Kuala Lumpur–Bukit Bintang
- Tun Razak Exchange–Samsung Galaxy (TRX)
- Cochrane
- AEON–Maluri
- Taman Pertama
- Taman Midah
- Taman Mutiara
- Taman Connaught
- Taman Suntex
- Sri Raya
- Bandar Tun Hussein Onn
- Batu 11 Cheras
- Bukit Dukung
- Sungai Jernih
- Stadium Kajang
- Kajang
|
Phase 1 Opening 2025 | |
---|---|
Phase 2 |
- Kwasa Damansara
- Rubber Research Institute (planned)
- Kampung Selamat
- Sungai Buloh
- Damansara Damai
- Sri Damansara Barat
- Sri Damansara Sentral
- Sri Damansara Timur
- Metro Prima
- Kepong Baru
- Jinjang
- Sri Delima
- Kampung Batu
- Kentonmen
- Jalan Ipoh
- Sentul Barat
- Titiwangsa
- Hospital Kuala Lumpur
- Raja Uda–UTM
- Ampang Park
- Persiaran KLCC
- Conlay–Kompleks Kraf
- Tun Razak Exchange–Samsung Galaxy (TRX)
- Chan Sow Lin
- Bandar Malaysia Utara (planned)
- Bandar Malaysia Selatan (planned)
- Kuchai
- Taman Naga Emas
- Sungai Besi
- Technology Park (planned)
- Serdang Raya Utara
- Serdang Raya Selatan
- Serdang Jaya
- UPM
- Taman Universiti (planned)
- Taman Equine
- Putra Permai
- 16 Sierra
- Cyberjaya Utara–Finexus
- Cyberjaya City Centre–Limkokwing
- Putrajaya Sentral
Opening 2028-2030 |
|
---|
This Malaysian rapid transit article is a stub. You can help Wikipedia by expanding it. |
- v
- t
- e